Manufacturing Operations

EXECUTE

Manufacturing Operations Sprints

 A series of sprints. With your team. Live or virtual. Public and private.

The Innovation Garage® Manufacturing Operations Sprints turn a proven design into work the shop floor can run. In a series of private or virtual sprints, teams start with DFM/DFA, then the metal or plastics processes required, followed by GD&T so the part can actually be made. Design-to-cost is expanded here when required and is used inside these sprints when the team needs the final cost target before product launch.

The methods stay with the team so the next design and manufacturing cycle moves forward.

DFM/DFA

Start here. Apply DFM/DFA methods on the live design.

Manufacturing processes

Work the live parts and assemblies so the methods stick.

Document with GD&T

Documentation and design intent for the shop floor or supplier.

What you leave with

  • The methods applied to live products or processes
  • Process methods the team can run as an operating model
  • Documentation the shop floor and supplier can use. Ready for manufacturing

What we cover

  1. DFM/DFA application. Apply design for manufacturability and assembly to the live part so it can be made and assembled without redesign cycles.
  2. Metal forming and machining. Work the metal process in front of you: machining, press brake and related forming, and casting.
  3. Injection molding. Apply material selection, process fundamentals, troubleshooting, and plastics considerations so the parts work.
  4. Fundamentals of GD&T. Deconstruct ASME Y14.5 Geometric Dimensioning and Tolerancing, so the team can read and apply the standard to communicate basic design intent for ideal inspection.
  5. Advanced GD&T. Advanced methods for communicating design intent for application, metrology, and inspection.

Manufacturing Operations Sprint Options

DFM/DFA first. Select the manufacturing processes for your team. Then GD&T.

Apply DFM/DFA to the live part designs and assemblies so the product can be made and assembled without redesign cycles. Private or virtual.
Apply the metal process in front of you. Machining, metal forming (sheet metal and related), and casting. The team works the live parts so the method sticks. Private or virtual.
Apply injection molding methods to the live part. Includes material selection, process fundamentals, troubleshooting, plastics and polymer considerations, and related additive manufacturing when it supports the path. Private or virtual.
Fundamentals – Deconstruct the ASME Y14.5 standard so the team can read and apply the concepts to communicate design intent.
Advanced – Apply GD&T to capture design intent, inspection methods, metrology, and quality analytics.

How They Run

A series of private or virtual 30-day sprints that start with the live design or process, apply the methods, and give the team an operating model they can run.

Intake and Pre-Work

Bring the live design or process. Align on the starting point.

Live or Virtual Sessions

Work the method on the actual parts, assemblies, or manufacturing processes.

Application to the live product

Leave with an operating model and ability to run the next cycle.

If your team needs the design made manufacturable, the process methods applied, and the documentation to support the shop floor and suppliers to build, this is the sprint.

DFM/DFA first, the manufacturing operations and process, then the documentation so the parts can actually be made.”

The Innovation Garage

manufacturing operations sprints | the innovation garage
keyboard_arrow_up